Project: N524JL/N87JL   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeremy Leonard   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1074
Total Flight Time:
Start/Last Date:Mar 17, 2021 - No Finish Date
Engine:Lycoming IO360M1B
Propeller:Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
 
Friendly URL: https://eaabuilderslog.org?s=N524JL/N87JL

Home or Last Project Picture

Oct 12, 2021     Closing up the left elevator& beginning trim tab completion - (6 hours)       Category: Empennage
With the trailing edge bent correctly or as close to perfect as I could get them, it was time to rivet the left elevator together. This went pretty smoothly and easily as everything was reached with the squeezer. As before I had the FAA inspection Ferret check the work, which passed. Next was to move onto the trim tab which as you may have read earlier is going to go together a little bit different because of the riblets I fabricated. So I had to stray away from the assembly instructions for this part.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.